EPC MIDSTREAM
Colombia
BPD
MM.USD
Days
Fast delivery, excellent result
TSE has designed and built a Modular Oil Production Facility in Colombiain the period 2013 – 2016. The project included the engineering, procurementand construction of the following equipments: Air Compression,desulfurization Plant, Power Generation, Fluid proccessing.
EPC / 2013-ongoing
Well services
EPC / 2013-2016
Modular oil production facility
BOMT / 2014
Modular oil production facility
BOMT / 2010-2014
Modular oil production facility
EPC / 2003-2008
Modular oil production facility
EPC / 2013-ongoing
Modular Gas Processing
Cale 7 con Av. 9B. Edif. BIV. Oficina 8. Maracaibo.
Avenida Figueroa Alcorta 3351 Loft 5, Buenos Aires